|
|||||||
Name used | Year | Latitude | Longitude | Catalog No. | Information | ||
2008 | -5.98 | 32.80 | ZFMK 41848 | K. Kardashev and I. Ivanova, Seasonal pool on the right side of the main road T8 from Ipole to Rungwa, near Mabangwe village, close by the bridge over the Limba Limba River, Malagarasi River
drainage Portal: FB. Source: ZFMK |